Nasa Space Shuttle Orbiter Plans Drafted By Grumman Aerospace: Main Propulsion - May 18, 2023 | Lion And Unicorn In Fl
LiveAuctioneers Logo

lots of lots

NASA Space Shuttle Orbiter Plans Drafted by Grumman Aerospace: Main Propulsion

Related Space & Astronaut Memorabilia

More Items in Space & Astronaut Memorabilia

View More

Recommended Historical Memorabilia

View More
item-152157788=1
item-152157788=2
item-152157788=3
item-152157788=4
item-152157788=5
item-152157788=6
item-152157788=7
item-152157788=8
item-152157788=9
NASA Space Shuttle Orbiter Plans Drafted by Grumman Aerospace: Main Propulsion
NASA Space Shuttle Orbiter Plans Drafted by Grumman Aerospace: Main Propulsion
Item Details
Description
Original set of Master Schematics from Grumman Aerospace titled, Space Shuttle Orbiter: Main Propulsion System, as developed by Grumman for NASA as part of the Space Shuttle Development Contracts in 1972.

Grumman became a key player in space technology as the company designed and built the Apollo Lunar Module that was used for the moon landing. In the Post-Apollo era, NASA issued a development contract to Grumman under its new Space Shuttle program to design and develop an Orbiter vehicle which could be reused on multiple missions. These extremely rare original schematics are part of the master plans drafted by Grumman under the NASA development contracts. The plans are entirely hand drafted in pencil on a delicate ivory tinted trace paper which was a common medium used by engineers for drafting technical documents. This document still has portions of border drafting tape that was applied to the surface of the drawing. These extremely rare original schematics are part of the master plans drafted by Grumman under the NASA development contracts. The plans are drafted on translucent polyester/plastic drafting film which was a common medium used for creating master drafting documents during this period. The full description of the plans as found in the Grumman Aerospace seal in the lower right-hand corner of the page is Space Shuttle Orbiter, Main Propulsion System, Integrated Function Configuration Level II Diagram, and are dated Feb. 24, 1972. The lower right also indicates that the plans were drawn by E. Eyler, reviewed by: F. Dick and approved by V. Simone and G. Cotter. This set of plans bear identification No.: B3L0180-1105.

Issued: Thursday, February 24, 1972
Dimensions: 11" x 23.5"
Buyer's Premium
  • 25%

NASA Space Shuttle Orbiter Plans Drafted by Grumman Aerospace: Main Propulsion

Estimate $200 - $800
See Sold Price
Starting Price $20
1 bidder is watching this item.

Shipping & Pickup Options
Item located in Hollywood, FL, us
Offers In-House Shipping
Local Pickup Available

Payment
Accepts seamless payments through LiveAuctioneers

Lion and Unicorn

Lion and Unicorn

badge TOP RATED
Hollywood, FL, United States8,860 Followers
TOP